Project summary
Jade Aden Interiors engaged Carman Contracting to deliver the full design and electrical installation for a 100,000 sq ft warehouse conversion in Andover. The project transformed an industrial space into a distribution hub for a leading cosmetics brand, with works including LV distribution, data and fibre cabling, packing benches, fire safety, CCTV and door access systems. Delivered at night and on a tight schedule, the project supports over 10,000 pallet spaces and high-volume fulfilment operations.
Project name
Building, electrical, fire and security installation for CPG Logistics, Andover
Client name
Jade Aden Interiors Ltd
Sector
Industrial
Services provided
Building, electrical work, fire and security
Scope of works
Segregation of industrial space for distribution hub
Structural cabling
Surface tray and containment
Low voltage (LV) distribution
Forklift charging points
Installation of packing benches
Fire alarms
CCTV
Access doors
Programme duration
3 months